Sign In / Sign Up Book a call
Web Development · SEO-ready · GEO-ready

Website Development Services

Landing pages, corporate sites, stores and platforms with structure, speed, markup and analytics built in before launch. The site starts collecting demand on day one, not after a round of fixes.

from $1,000 · landing page: 1 month; online store: 6+ months

4.660+ reviewsGoogle Reviews
18years in digitalin business since 2008
500+projects and clientsUkraine, EU, US
11countrieswe work worldwide
Approach

Growth architecture first, design second

Development at SEOquick starts with demand, not with a pretty mock-up: keyword research and a page map come first, otherwise the design has nothing to hold on to in search. We build landing pages, corporate sites, stores and internal products ready for SEO, GEO, analytics and scale.

Core Web Vitals, structured data, hreflang and analytics events are built in at the coding stage, not patched after release. Changes ship through staging, so a new feature never breaks the live site.

Our measurement

What happens to search traffic after our launches

×2
clicks within two months of launch on two of five sites
+91%
non-brand clicks year on year on a seasonal cruise site
97/100
PageSpeed after moving from WordPress to static

A launch has two prices. One is in the estimate. The other is search traffic, and almost nobody puts it in writing. We went through the Search Console data of five launches we were involved in, our own site among them.

Five launches, one line nobody puts in the quote

Weekly clicks from Google (Search Console) before and after five site launches we were involved in. Switch between sites; hover a point for the week.

Clicks per weekLaunch
02505007501,000Jul 25Oct 25Jan 26Apr 26Jul 26Oct 26WordPress → Hugo, 9 Jun

Our own move. A dip in the first one to two months, then back to the pre-launch level and above last year: September +17% year on year.

Show before / after numbers
SiteLaunchClicks 28 days before → afterClicks 56 days before → afterOld URLs carried over
seoquick.com.ua9 Jun 20262,327 → 2,024 (−13%)4,845 → 3,873 (−20%)all valuable pages; junk removed on purpose
daneriyachts.com21 Apr 20261,185 → 1,856 (+57%)*2,075 → 5,067 (+144%)*98.5% of clicks
polygraph-expert.com21 Aug 2026115 → 199 (+73%)211 → 445 (+111%)15 of 15
stelipro.com.ua21 Jul 202662 → 79 (+28%)119 → 173 (+46%)25 of 25
innova-diagnostica.com.ua4 Jun 2026427 → 517 (+21%)780 → 994 (+27%)6 of 6
Source: Google Search Console of each site, web search, exported 19 October 2026; launch dates detected from the first impressions of new URLs. *DanEri launched into its high season; with brand clicks as the seasonal control the gain is 13–46%.

Where every old URL had a one-to-one destination, nothing was lost: two of the launches doubled clicks within two months, and on a seasonal cruise site non-brand clicks are up 91% year on year. On our own site clicks dipped for one to three months and then went above last year’s level.

The full breakdown, with redesign prices and what a quote has to include, is in our website redesign cost study; development prices by site type are in what a website costs.

What we build in

Four things that decide whether a site grows

Structure built around demand

Keyword research and a page map come first, design second. Otherwise the site looks good but gives search engines nothing to hold on to.

Speed and a clean technical base

Core Web Vitals are built in at the coding stage, not patched after launch. We pick the platform for how you will live with the site, not for what is easiest for the contractor.

Indexing and language versions

schema.org, sitemaps, hreflang, and redirects are set up before release. On BeCoin that means 44 locales and 57,070 hreflang links validated automatically on every build.

Analytics and safe releases

GSC, GA4, GTM, and events go live before launch. Changes ship through staging, so a new feature does not break the live site.

Prices and timelines

What a turnkey website costs

We work month by month: scope and hours are agreed before each month starts, so the estimate does not grow by surprise. Below is the order of budget for typical projects.

Landing page

One long page for one offer: a form, analytics, ad pixels.

from$1,000≈ 1 month
  • Structure built around demand and offer
  • Design and responsive build
  • Spam-protected form
  • GA4, GTM and ad pixels
  • Launch and indexing check
Discuss your project
Most chosen

Services or corporate site

5–30 pages, structure built on search clusters, a blog, language versions.

from$4,0002–4 months

Everything in Landing page, plus:

  • Keyword research and page map
  • Admin panel for text edits
  • schema.org, sitemap, hreflang
  • Redirects from the old site
  • Training for your team
Discuss your project

Online store

Catalogue, filters, cart, payment, delivery, stock integration.

from$12,0006+ months

Everything in Corporate site, plus:

  • Catalogue and indexable filters
  • Cart, payment, delivery
  • Feed from your accounting system
  • Customer account and CRM
  • Product structured data
Discuss your project

A month of team time is $1,000–2,000. Development prices on the Ukrainian market differ 7–20× for the same type of site. Our breakdown of development prices

Best fit

When development with SEO pays back fastest

A new site that has to sell from search

When the site must bring in customers, not just look good in a presentation.

Moving from another CMS or domain

A migration without a redirect map is a common cause of traffic loss. We move every old URL one to one and check indexing after launch.

Outgrowing a website builder

On a builder you do not control speed, markup or URL structure. If you plan to grow, moving now, while the site is small, is cheaper.

A multilingual launch

Language versions with local URLs and copy written for each market's demand: DanEri runs three languages, BeCoin 44 locales.

Process

How a project runs

01

Structure and design

Month one: keyword research, page map, wireframes, and design of key screens. Little is visible yet, but this is where the timeline of the whole project is decided.

02

Build and technical foundation

Templates, speed, markup, sitemaps, hreflang, spam-protected forms.

03

Copy, SEO, and analytics

Copy that follows the structure, meta tags, GSC, GA4, GTM, and events — before launch, not after.

04

Launch and training

Release through staging, an indexing check after launch, and training for your team on the admin panel.

Proof

Results you can verify

We show real projects, not promises: how visibility, traffic, leads, and client trust changed after structured work with SEOquick.

What clients say
Team

Your project is led by practitioners, not layers of account managers

SEOquick keeps strategy close to the people doing the work: Nikolay leads SEO growth and quality control, while Anatolii strengthens projects with AI, GEO, and analytics. You see the reasoning, not just a task list.

Nikolay Shmichkov, SEOquick
CEO SEOquick · SEO Strategy

Nikolay Shmichkov

18 years in digital, 500+ articles, 6 podcasts, and regular online SEO/GEO sessions. He leads strategy, priorities, and final quality control.

Anatolii Ulitovskyi, SEOquick
Founder · AI & GEO Strategy

Anatolii Ulitovskyi

Founder of SEOquick and unmiss.com. He specializes in AI search, GEO, entity markup, llms.txt, and analytics systems for visibility in Google and LLMs.

FAQ

Questions before kickoff

How much does development cost?

We sell months of team time: $1,000 a month for a landing page and $2,000 a month for everything else. Typical budgets start at $1,000 for a landing page, $4,000 for a service site, $8,000 for a corporate portal, and $12,000 for an online store. Each additional language version adds $400.

How long will it take?

A landing page takes a month, a simple service site two, a corporate portal four, an online store six or more. Deadlines in the contract are firm; what usually stretches them is slow approval on the client side, because the next month does not start until the previous stage is signed off.

What is included, and what is billed separately?

Included: structure, design, build, copy for the planned pages, SEO foundation, analytics, and team training. Separate: domain, hosting, and licences, because you should own them, not the studio.

Can the estimate grow along the way?

Only if the scope changes: a new page type or a new feature. That is visible and agreed before the month starts, never billed after the fact.

What happens after launch?

The site moves to support: content uploads, fixes, new blocks. Mistakes that were ours are fixed free of charge.

We are on Tilda or Wix. Should we move?

If you plan to grow, yes. On a builder you do not control speed, markup, or URL structure, and you hit the ceiling exactly when growth starts. A small site is cheaper to move.

Free 45-minute consultation

Tell us about the project and we will name the timeline and budget

In one call we go through the task, suggest a platform and an order of budget, and say what to build into the structure from day one.